Electric Rates
Rates effective 7/1/2026
Customer Charge $16.64/month
Energy Charge $.127/kWh
GENERAL SERVICE (NON RESIDENTIAL SERVICE < 50 kWh)
Customer Charge $20.80/month
Energy Charge $.124/kWh
Customer charge $41.60/month
Demand charges $3.85/kW of billing demand*
Energy charge $.124/kWh
Power factor penalty – increase demand by 1% per each % below 90%
*Minimum demand charge is no less than 75% of highest demand during preceding 11 months, and in no case less than $200.00.
Customer charge $20.80/month
Energy charge $.129/kWh
20 -30 watt LED $8.50/month
31 – 50 watt LED $10.00/month
51 – 100 watt LED $12.50/month
101 – 150 watt LED $15.00/month
70 watt HPS $8.50/month
100 watt HPS $10.00/month
200 watt HPS $15.00/month
400 watt HPS $20.00/month
ECONOMIC DEVELOPMENT RATES
MUNICIPAL BUILDING RATES
Customer Charge $35.36/month
Energy Charge $.116/kWh
Connect/Reconnect fee: $50 (Actual labor costs, plus 15% after business hours)
Transfer fee: $40 (Shut off due to unauthorized use: actual labor costs plus $15%)
Meter testing fee: $100 (if test initiated by customer)
Residential
- 100 amp: overhead $800, underground $1,100
- 150 amp: overhead $900, underground $1200
- 200 amp: overhead $1000, underground $1500
- 400 amp (Class 320): overhead $1,200, underground $2,000
Residential temp connect fee $250
Commercial
- 100 amp: overhead $1,200, underground $1,400 PLUS transformer costs
- 150 amp: overhead $1,300, underground $1,500 PLUS transformer costs
- 200 amp: overhead $1,500, underground $2,000 PLUS transformer costs
- Over 200 amp: overhead $1,750, under $2,400 plus $15 per KVA requirement, plus transformer costs
Commercial overhead 3 phase
- 100 amp: $2,000 plus transformer costs
- 150 amp: $2,200 plus transformer costs
- 200 amp+: $2,500, plus $15 per KVA requirement, plus transformer cost
Commercial underground 3 phase
- 100 amp: $2,200 plus transformer costs
- 150 amp: $2,400 plus transformer costs
- 200 amp: $2,600, plus transformer cost
- Over 200 amp: $2,750, plus $15 per KVA requirement, plus transformer cost
Commercial temp:
- Single phase: $250
- Three phase: $850
Service upgrade fee: Customers who request to upgrade service shall pay the difference between their current service connection fee and the requested service connect fee.
- Residential up to 6 sockets or outlets; heat pump installations: $50
- Residential over 6 sockets or outlets: $75
- Temp meter setting or other misc. works: $50
- Commercial buildings: $75 plus $.25 per socket or outlet
- The above fees include 2 inspections: 1 rough and one final
- Additional inspections: $50
- For inspections of any electrical equip for which no fee is specifically prescribed: $50
- Upon failure to make application and secure permit by the 2nd workday after commencing work: add $50 to permit fee. Permits will be issued by the electrical inspector withing 72 hours from time of application, Saturdays, Sundays, and holidays excluded.
- Permit fees for Borough-owned projects or work may be waived by the utility director, however connection fees shall still apply.
Secondary service work: If secondary service work is required, the customer will be charged actual costs. Customers requesting such service outside of normal working hours shall pay actual labor costs, including overtime and double time pay rates that apply.